Water

Our water projects include some that require miles of new main line up to 24″ PVC or DIP to be installed, rework of existing infrastructure or the installation of domestic or fire taps to provide service to your project.

As well, we have rebuilt and installed large meter structures and major and minor PRV(Pressure Reducing Valves) and structures. In addition, we have been called upon to install such specialized systems as high pressure onsite fire protection with operating pressures exceeding 250psi.

We have also preformed boring and jacking up to 300′ with a 42″ profiled casing. JBM has provided our clients with emergency contact information to deal with their unexpected issues.

Categories: